An ambitious community swimming pool project
How we've responded to concerns about wildlife, traffic, drainage and the community.

We instigated an independent ecology and wildlife survey, including compliance with bat presence investigations.
We undertook a full traffic data collection plan covering parking beats, traffic counters and junction counts to assess the impact.
We sought pre-planning advice and adapted the pool's design to accommodate 60 additional on-site spaces, in addition to the 100 spaces already available.
We undertook borehole surveys to a depth of 5m+ confirming sufficient bearing capacity for the structure.
We're proposing a green roof and Sustainable Urban Drainage standards, and undertook a percolation test to confirm our approach.
We have consulted with Thames Water and Southern Water, who have confirmed sufficient capacity for supply and waste water.
We will renovate the school's 'chicken field' with a brand new MUGA facility to offset the loss.
The pool will be constructed off-site in modular form and shipped to Bourne End, reducing construction time and traffic movements.
We're aiming for net zero using a mix of air source heating, solar PV panels and battery storage.
Pool equipment will be housed in an attenuated plant room, keeping noise minimal, with air source heating chosen for its quiet operation.
We're timetabling a wide variety of community uses, including aquafit, adult swimming, life-saving training and water babies classes, alongside the club's own needs.
Help us build an inclusive community swimming pool in Bourne End.